Medium-term Projects

  1. Construction of roads.
  2. Land re-adjustment of Dasht-e-Barchi, Qala-e -Zaman Khan, Gul Bagh and Karta-e-Naw.
  3. Construction of Bus Rapid Transit (BRTs)
  4. Construction of multi-storey car parks
  5. Construction of waste-water systems (package type)
  6. Transformation of market area into commercial area
  7. Renovation of Charchata market
  8. Construction of markets in the city peripheries.
  9. Rehabilitation of Shahr-i- Naw Park
  10. Development of economic and recreational zone in Qarghah
  11. Development of economic and recreational zone in Sayyad
  12. Development of economic and recreational zone in Gul Ghondi
  13. Development of economic and recreational zone in Band-i-Ghazi
  14. Development of urban e-governance through creation of urban information database
  15. Construction of agro-industrial park and cold-storage houses at Mohammad Agha.
  16. Construction of economic and recreational zone at Mohammad Agha
  17. Linkage of economic and cultural zone of Paghman to Salang
  18. Planning for the roadside development from Kabul to Jabal Siraj
  19. Construction of agro-industrial park and cold-storage houses at Maidan Shahr.
No. Project Name Location Province/City Description Economic Analysis
1 Construction of City Roads Kabul Kabul/Kabul The Construction of Road Project consists of the following sub-projects:
  • 40m wide and 4.5km long road from Parwan 3 till 500 family area.
  • 30m wide and 3.6km long road from Sarsabzi Square till 315 area.
  • 80m wide and 9.5km long road from Qala Zaman Khan till Ahmed Shah Baba Mena.
  • 50m wide and 1.9km long road from Shaheed Square till Qasaba.
  • 21m wide and 3.87km long road from Sarai Shamali till Karta Parwan (Badam Bagh Road).
  • 12m wide and 1.5km long road from Polytechnic Square till Sarai Shamali.
  • 33m wide and 2.96km long road from Kartai Sakhi till Kartai Ariana.
  • Under the Infrastructutre development program, the construction of stone road has been explained.1
  • The cost of this project is 14 % of the cost of all projects in the Infrastructure program
  • Employment opportunities (6 % skilled and 6 % unskilled labor)
2 Upgrading of unplanned areas of Dasht-i-Barchi, Qala Zaman Khan, Gul Bagh and Karta Naw Kabul Kabul
  • Construction of public facilities
  • Construction of tertiary roads
  • Other infrastructure projects in the unplanned areas of Dasht-i-Barchi, Qala Zaman Khan, Gul Bagh and Karta Naw
  • Unplanned areas are listed in the Upgrading Development Program.
  • The cost of this project is 29 % of the total cost of the projects under the Upgrading, Renovation and Improving the Quality of Unplanned Settlements Program
  • Employment opportunities (25% skilled and 26 % unskilled labor)
3 Construction of BRTs Kabul Kabul/Kabul The BRT Project consists of the following components:
  • BRT from Company area till the City Center (12 km long with 14 buses)
  • BRT from Ahmed Shah Baba Mena till the City Center (20.5 km long with 24 buses)
  • BRT from Mazar Bus Station till the City Center (12.5 km long with 14 buses)
  • BRT from Pul-i-Charkhi till the City Center (22.6 km long with 26 buses)
  • BRT from Char Asyab till the City Center (22 km long with 24 buses)
  • BRT from Darul Aman till the City Center (8.8 km long with 10 buses)
  • BRT from Sarai Shamali till the City Center (12.3 km long with 14 buses)
  • Construction of bus terminal
  • Facilitating the movement of residents to remote points in the city and reducing the travel time.
  • Bringing down the transportation costs for the travellers and promoting other economic activities.
  • Eleminating the un-necessary traffic congestion and establishment of modern transportation system as per international standards.
  • Prevention of traffic accidents.
  • The cost of this project is 15 % of total cost of projects within the Infrastructure Program.
  • Employment opportunities (16% skilled and 9 % unskilled labor)
  • The level of job creation due to this project in proportion to the project cost is high and the project is economical.
4 Construction of multi-storey car park City Center Kabul/Kabul The construction of multi-storey car park consists of the following projects:
  • Multi-storey car park at city center with capacity of 400 vehicles.
  • Multi-storey car park at Bagh e Ali Mardan with capacity of 500 vehicles.
  • Introduction of multi-storey car park for the first time in the country.
  • Decrease in roadside parking in the city center and prevention of resulting traffic congestion.
  • Providing opportunity for private sector investment in the service sector.
  • Creating new sources of revenues for the Municipality (tax payments by the private sector/Direct collection of revenues for the services)
  • The cost of this project is 3 % of total cost of projects within the Infrastructure Program.
  • Employment opportunities (5% skilled and 4 % unskilled labor)
5 Building a Wastewater System (Package type) District 10 Kabul/Kabul Construction of wastewater treatment plant for 300,000 users of district 10 with a capacity of 9000 m3/day within 0.8 hectare of land area. The project has been chosen as pilot project . In case of success, such system will be applied citywide in Kabul.
  • Development of modern infrastructure by using latest technologies.
  • Prevention of environmental and groundwater contamination.
  • Positive effects on the environment and quality of life of the residents.
  • Providing modern cost-effective infrastructure.
  • The cost of this project is 2 % of total cost of projects within the Infrastructure Program.
  • Employment opportunities (2% skilled and 2 % unskilled labor)
  • The level of job creation due to this project in proportion to the project cost is high and the project is economical.
6 Transformation of Market Area into Central Business Area Kabul Market Kabul/Kabul Transformation of Kabul Market, considering opportunities and risks, shall be implemented in five stages. The first stage of the process consists of the following projects:
  • Transformation of Kabul Market area into central business area.
  • Construction of 740 residential apartments at Bagh Ali Mardan area.
  • Construction of District 1 Police Station at Bagh Ali Mardan.
  • Relocating the Court office to the Kabul Governor complex.
  • Construction of Money Exchange Center on government land.
  • Construction of Bagh-e-Omoomi Kabul.
  • Boosting the economy and providing a solid foundation for economic and commercial activities.
  • Providing shelter and housing for approximately 3700 people.
  • Upgrading and providing facilities in the concerned area.
  • Promotion of money exchange business and other market-oriented activities.
  • Turning the existing area into a planned commercial and residential area (maximum uitlization of land)
  • Creation of economic and cultural activities by restoration of Bagh-e-Umoomi as a major cultural center.
  • The cost of this project is 11.3 % of total cost of projects within the Creation of Economic Activities Program.
  • Employment opportunities (4.4% skilled and 5.1 % unskilled labor)
7 Rehabilitation of Charchata Market Charchata Market Kabul/Kabul This project will revive the traditional market of Charchata as well as promote the culture of traditional markets in Kabul City.
  • Economic development, revival of traditional markets in Kabul.
  • Making Old Kabul as part of the regional economic development process
  • Accelerating commercial activities and familiarizing residents with covered markets within the city.
  • Reducing the number of vendors in various parts of the city through building of traditional market.
  • Attracting domestic and international tourists.
  • The cost of this project is 1.6 % of total cost of projects within the Creation of Economic Activities Program.
  • Employment opportunities (0.6% skilled and 0.5 % unskilled labor)
8 Construction of Markets in the Suburbs of Kabul Botkhak, Char Asyab and Western part of the Capital Region Kabul/Kabul The Construction of Markets in suburbs of Kabul consists of the following project:
  • Construction of Market at Butkhak in 20 hectare
  • Construction of Market at Char Asyab in 20 hectare
  • Construction of Market at western parts of the city in 20 hectare
  • Accelerating economic growth and creation of organized zones for commercial activities.
  • Decentralization of economic activities from the city center to the surrounding areas for increased accessibility
  • Reducing travel distances to commercial centers.
  • Providing planned areas for commercial activities and store houses for commercial goods
  • Increasing people's access to retail and wholesale business and development of new economic linkages with neighboring provinces (a positive step towards the economic development of neighboring provinces)
  • The cost of this project is7.3 % of total cost of projects within the Creation of Economic Activities Program.
  • Employment opportunities (65% skilled and 51 % unskilled labor)
  • The level of job creation due to this project in proportion to the project cost is high and the project is economical.
  • 9 Rehabilitation of Shahr-e-Naw Park Shahr-e-Naw Kabul/Kabul The project will be designed and implemented to preserve the character of the Park as well as provide a recreational space to all segments of society. One of the important elements
  • Positive social development (Increase of recrational areas to prevent adverse impacts due to environmental degradation)
  • Creation of urban recreational areas.
  • Development of clean envionrment by increasing green areas and reducing the air pollution.
  • The cost of this project is 0.8 % of total cost of projects within the Creation of Economic Activities Program.
  • 10 Development of economic and recreational zone at Qargha Qargha Kabul/Kabul Qargha is an area with high economic and recreational potential.The Economic and Recreational Zone of Qargha consists of the following projects:
  • Construction of Qargha Ring Road (4.7 km long and 18m wide)
  • Construction of secondary road (2.2 km long and 18 m wide)
  • Construction of Recreational Park for Kids
  • Upgrading and further development of the Western part of Qargha.
  • Positive social development (Increase of recrational areas to prevent adverse impacts due to environmental degradation)
  • Creation of recreational areas and generation of revenues from recreational services.
  • Development of clean envionrment by increasing green areas and reducing the air pollution.
  • Building standard transportation routes and increasing accessibility to recreational areas.
  • Positive step in transportation development and reduction of travel costs due to better transport facilities.
  • Providing better transport routes within Qargha.
  • The cost of this project is 21.9 % of total cost of projects within the Creation of Economic Activities Program.
  • Employment opportunities (1.27% skilled and 2.72 % unskilled labor)
  • 11 Development of economic and recreational zone at Sayyad Sayyad Parwan/Bagram It is recommended to prepare the development and detailed plans for the Sayyad economic an recreational parks. It is proposed to construct a portion of the recreational area for
  • Positive social development (Increase of recrational areas to prevent adverse impacts due to environmental degradation)
  • Creation of recreational areas and generation of revenues from recreational services.
  • Increasing accessibility to recreational areas.
  • The cost of this project is 1.6 % of total cost of projects within the Creation of Economic Activities Program.
  • Employment opportunities (1.27% skilled and 2.3 % unskilled labor)
  • 12 Development of economic and recreational zone at Gul Ghundi Gul Ghundi Hill  Parwan/Charikar It is recommended to prepare the development and detailed plans for the  Gul Ghundi economic an recreational parks. It is proposed to develop a portion of the recreational area 
  • Positive social development (Increase of recrational areas to prevent adverse impacts due to environmental degradation)
  • Creation of recreational areas and generation of revenues from recreational services.
  • Increasing accessibility to recreational areas
  • The cost of this project is 1 % of total cost of projects within the Creation of Economic Activities Program
  • Employment opportunities (0.6% skilled and 1.7 % unskilled labor)
  • 13 Development of economic and recreational zone at Band-e-Ghazi  Mohammad Agha District Logar/Mohammad Agha The estimated area covered by the Band-e-Ghazi Recreational zone is 35 hectares. For the sustainable development of this unique area, it is proposed to prepare the development, 
  • Positive social development (Increase of recrational areas to prevent adverse impacts due to environmental degradation)
  • Creation of recreational areas and generation of revenues from recreational services
  • Increasing accessibility to recreational areas
  • The cost of this project is 1 % of total cost of projects within the Creation of Economic Activities Program
  • Employment opportunities (0.6% skilled and 1.7 % unskilled labor)
  • 14 Development of urban e-governance through creation of urban information database Kabul Kabul/Kabul The establishment of urban e-governance through the development an integrated urban information database for planned areas in the first stage for the entire city. 
  • Introduction of modern governance system
  • Savings on service costs by introduction of e-governance
  • Positive impact on governmental administative work, balanced work load and increasing the overall quality of work
  • Eliminating the administrative bureaucracy and accelerating the work flow
  • Increasing the capacity of professionals through the introduction of e-governance at different levels.
  • 15 Construction of agro-industrial park and cold-storage houses at Mohammad Agha. Mohammad Agha District Logar/Mohammad Agha In order to ensure balanced development in the capital region, it is planned to develop an agro-industrial park or light industries park in an area of 120 ha at Mohammad Agah District 
  • Development of agriculture and modernizing the practice of agriculture in the country
  • Development of industries and accelerating the production and trade through the establishment of such zones
  • Development of systems for industrial and agricutural products including standardization for such products, packaging, storage houses etc. for better utilization of industrial products
  • Creating opportunities for the promotion of exports (industry and agriculture)
  • Fall in prices of domestic commodities for the citizens
  • Progress in the growth of Grand Domestic Products
  • The cost of this project is 11 % of the total cost of projects for creation of economic activities
  • Creation of job opportunities for skilled labor (6%) and unskilled labor (12%) out of all the projects within the category of creation of economic activities)
  • 16 Development of economic and recreational zone at Mohammad Agha District Surkhab Logar/Mohammad Agha Mohammad Agha district has huge potential and the development of economic and recreational zone within the district is essential to adhere to the principle of balanced development in the capital region. The Economic and Recreational zone development project will consist of the following sub-projects:
  • Development of Economic and Recreational area at Band-e-Surkhab
  • Development of the first phase of Surkhab Research Center.
  • The first phase of Surkhab Research Center will consist of the following proposed projects:

    1. Plantation of the hill close to the research center
  • Construction of preliminary structures for the research center
  • Construction of 15 km long road from Pul-e-Qandahari till Surkhab Dam.
  • Balanced development in the promotion of culture, and utlization of recreational areas to the west of the Capital Region
  • Inclusion of the western parts of the capital region in the regional economic development
  • Positive environmental impacts (Increase of green areas and cleaner environment)
  • Positive social development (Growth of recreational areas mitigating the negative environmental impacts)
  • Creation of recreational areas and generation of revenues from recreational services
  • Increase of access to facilities (educational, recreational, etc.)
  • Development of standard transport routes and increase of access to public facilities
  • Positive step in transportation development and reduction of travel costs due to better transport facilities
  • The cost of this project is 13% of the total cost of projects for creation of economic activities
  • Creation of job opportunities for skilled labor (1.2%) and unskilled labor (3.4%) out of all the projects within the category of creation of economic activities)
  • 17 Linkage of economic and cultural zone of Paghman to Salang Kabul-Parwan Kabul-Parwan The Linkage of economic and cultural zone of Paghman to Salang Project consists of the following sub-projects:
  • Preparation of Development Plan for the economic and recreational area from Paghman till Salang
  • Construction of road linking the economic and recreational area of Paghman to Salang
  • Balanced Social Development (Growth of recreational areas mitigating the negative environmental impacts)
  • Creation of recreational areas and generation of revenues from recreational services
  • Increase in green areas and positive environmental impacts
  • Development of standard transport routes for reducing the traffic congestion on Kabul- Parwan Highway
  • An important step in the development of transportation and reduction of transport related costs due to alternate routes
  • The cost of this project is 11% of the total cost of projects for creation of economic activities
  • Creation of job opportunities for skilled labor (2%) and unskilled labor (3%) out of all the projects within the category of creation of economic activities)
  • 18 Planning for the roadside development from Kabul to Jabal Siraj Kabul-Parwan Kabul-Parwan The project consists of planning for utilization of land along Kabul-Mazar highway from Mazar Bus Station till Jabal Siraj within the Capital Region
  • Development of required commercial areas along the highway
  • Development of greean and recreational areas along with car parks
  • A balanced development of villages along the highway
  • 19 Construction of agro-industrial park and cold-storage houses at Maidan Shahr Maidan Shahar Wardak/Maidan Shahr To ensure balanced development in the capital region, it is proposed to build an agro-industrial park or light industries park at Maidan Shahr in an area of 110 ha.
  • Creation of agro-economic opportunities in the area of consideration
  • Positive impacts on regional trade from growth of products (agro-industrial)
  • Providing facilities for processing the agricultural products in the region (Preventing degradation of products that can be processed)
  • Development of regional industries and introducing modern techniques to the relevant industrialists
  • Growth in agro-industrial products of the region and its positive effect on Grand Domestic Products (GDP)
  • The cost of this project is 10% of the total cost of projects for creation of economic activities
  • Creation of job opportunities for skilled labor (6%) and unskilled labor (12%) out of all the projects within the category of creation of economic activities)